Hi EWM Gurus ,
Inbound with VAS
Process flow
1) Unloading
2) Quality Inspection
3) VAS Workcenter
4) Splitting of put away task to forward pick area and reserve locations
5) Palletization
6) Put away to final bin
Is it possible to create VAS order for each HU received in the inbound delivery ?
Scenario - An inbound delivery having multiple HU of the same material can go to different packing table . So as you can see as there is a need to maintain multiple work center for the same VAS order . We have around 50 packing tables in the inbound process and the operator can choose to put it in any of these packing tables. So in order to achieve this
i) Each packing table is considered as work center
ii) For the storage type linked to the VAS work centers i have maintained WT generic as 2 so that it proposes only the storage type and not the work center (storage bin).
iii) In POSC for the VAS external step, only storage type is maintained since the work center is selected by the operator.
So the VAS order is created without a work center assignment . Whenever the the operator selects the bin , VAS work center is updated in the VAS order.
But if multiple HU's are available for the same inbound delivery line item it will go to multiple packing tables (work centers). So is there a way to achieve this scenario or Is it possible to create VAS order for each HU received in the inbound delivery ?
Regards,