Hi EWM Experts,
I need you help in knowing How to configure below scenario
in SAP EWM
Scenario: PP integration with SAP EWM with for materials
with backflush indicator
Current set up.
I have 2 plants. Plant A and plant B
Plant A is manufacturing unit where Raw material warehouse (A1)is
attached which is EWM managed
Plant B is a planning plan where Finished goods warehouse
(B1) is attached which is also EWM managed
I am creating process order in plant A for manufacturing finished
product. Finish product BOM consists of SFGs and packaging materials which are
EWM managed
What I want to do:
Create process order in Plant A by maintaining plant B as
Planning plant. Once process order is released, I am doing EGR in EWM managed
finished goods warehouse which is B1. At the same time, PMR is getting created
in RM warehouse which is A1. I did the configuration in Warehouse A1 as
suggested in SAP’s advance production integration documentation. As per
configuration, I can see Finished product in PMR as ‘receiving product”. Now I
want to stage SFGs and Packaging materials. I am able to stage SFGs using NWBC
staging menu however unable to stage packaging materials as they have backflush indicator. When I try to
create staging proposal, WT is not getting created. It is giving me error that
WPT are compatible with document category PWR.
As per SAP suggestion, I have assigned PCCO staging methods
to packaging materials.
Moreover, as per SAP documentation, Once Process order is
confirmed (once finished product is received), packaging materials should be
consumed automatically with the help of DOG type outbound delivery from SAP
ECC. However I am not able to even stage packaging materials let alone
consuming it.
Hence please let me know what am I missing in config like
what should be staging indicator for packaging materials (with Backflush indicator)
while creating control cycle? What should be process type for creating staging
WT?
Thanks for your time,
Tushar