Hi,
I'm trying to configure the following scenario in Quality in EWM 9.1:
Sample Inspection of IOT4 has been configured for an item. I wish to perform the quality at the quality work center at which the following decisions can be given -
1) Accept - In case of which the product is directly putaway to the putaway location.
2) Reject - In case of which the product is putaway to the scrap location.
3) 100% Inspection - In case of which, another Inspection Document of IOT5 gets created and 100% inspection is performed.
The above configuration is achieved by a Two step POSC. The first step ensures movement from staging area to quality work center and the second step achieves the putaway.
I've maintained the follow up actions for all scenarios and the WPT for these are category 7 posting change WPTs. This is because the system allows putaway to a location only upon use of this type of WPT. Upon use of a putaway/internal movement WPT and confirmation of quality at the work center, only a posting change will be created and no movement will happen despite mentioned a destination location in the WPT. The same thing, however will work in WPT of category 7.
In the WPT for follow up action for detailed inspection I've mentioned another POSC. But on executing the second task after closing HU in the quality work center (first step) the POSC is not picked up and no open tasks can be seen on the monitor for the same HU.
Please help out with this.
Thank you.