Dear experts,
is there any possibility to clear the PSA in EWM 9.2 without using the NWBC-menu ?
Kind regards
Rodrigo
Dear experts,
is there any possibility to clear the PSA in EWM 9.2 without using the NWBC-menu ?
Kind regards
Rodrigo
I am looking for solutions to do direct integration to the EWM API's from my MES system.
Is there any known way to do this?
Hi
I have a WM system with stocks inclusing of HUs because one of my WM managed storage location is also HU managed.
Now, I have converted WM storage locations to EWM and removed HU management indicators were earlier HU managed and completed all necessary configurations and system is working smoothly (i.e. any inbound/outbound deliveries created in WM managed storage locations are now being distributed to EWM and vice versa along with HUs created either in ECC or EWM systems)
I have uploaded the stocks to EWM system using transaction /SCWM/ISU without an update to ECC system. The stocks uploaded are inclusive of HUs existing in ECC stocks.
When I am trying to issue the HU stocks (which are newly uploaded to EWM) against any customer outbound deliveries using pick WT and do PGI in EWM system, I am seeing the an error (HUSELECT005) in SMQ2 of ECC system for the outbound delivery.
HUs I have chosen for picking are existing in WM system as SUs (in LQUA table) and also in EWM system (uploaded using ISU transaction.
Am I wrong anywhere here.
Depleting the stocks from WM system and then connecting that storage location to EWM system and then uploading hte stocks again into EWM system might work for me but SAP has already provided direct stock upload using ISU transaction without disturbing the ECC stocks.
I have following this direct stock upload to EWM system.
Would you please help me in resolving this issue.
Thank you.
Hi Experts,
Pls throw some light and give me inputs in solving my issue.
My Scenario is STO (Plant to Plant within comp.code) integrated with EWM:
1. Created STO: (Supplying plant/sloc and Receiving plant/sloc are EWM managed)
2. Created Outbound delivery: Distributed successfully to EWM
3. Done the all activities in EWM like Picking, Loading & Goods issue
4. In ECC stock is not reduced and no update of Mat.doc/indbound, and still the ECC Outbound delivery is in open status
5.If I want to try post MIGO wrt Outbound or STO PO is also not possible as my Outbound delivery is greyed out (once its distributed, its not allowing to change).
Thats how I got struck. Dont know what to do, If I am right I followed the correct process.
Thanks to All
Srinivas
Hi All,
I am getting Run time error while creating Inbound Delivery Notification from Inbound Queue and Inbound Delivery from IDN
After debugging i come to know that system is looking for Patch Level SAPKNA7026 but in my system Patch is upto SAPKNA7022
Is there any OSS notes available to deactivate/resolve this run time error ? I tried 0001798794 Deactivation of hierarchical access functionality but system is still giving me run time error
Regards,
P@M
Dear Experts
When I try to run the production supply, system does not find the Production Material Request.
Checking the Doc status related to staging are blank
DMP Planning Staging Production
DMS Staging Production
I have activate the Status Profile
/SCWM/PWR
/SCWM/PWR_CMP_CO
/SCWM/PWR_CMP_SO
/SCWM/PWR_OCP
Resend another Production Material request, but still not updating with NOT started.
any suggestions?
/SCWM/PSASTAGE - Assign Bin to PSA/Product/Entitled in Warehouse Number is updated.
many thanks
Natalia
Hi All
Units of measure for my EGR document item is not same as PO item UoM. It is taking Base Units rather.
Is there any SAP Note for this to happen.
I have corrected similar requirement for deliveries (ERP delivery Units were not same as distributed EWM delivery units) using SAP note 1600868.
Waiting for your valuable inputs.
Thank you.
Hello,
I need EWM Roadmap for my presentation. I searched forum but only found strategy till 2014 which i already have.
Maybe Matthias would help?
Basic words can also help(must be official). Because i have to translate them into Turkish, i can't use your document directly.
What i require;
- Main goals about next releases
- Future plans(for the next 3 years)?
Please help,
Best regards.
Serhan.
Hi Gurus,
Need your advice with QM-EWM integration.
We are trying to generate an Inspection lot "01" in ECC while using EWM as our Warehouse.
Material is not HU managed so the trigger of IL should be via Good Receipt. If material is HU managed the inspection lot trigger is via Inbound delivery HU assignment.
The following has been done:
Below is the process.
The question now is it possible to generate an Inspection lot in ECC even if GR happens in EWM? w/o EWM the scenario is generating Inspection lots.
Hi All
Is there any way to reverse/cancel the GR document posted for an inbound delivery which is already closed by warehouse task confirmation.
Thank you in advance.
Hi,
We have developed one customized view in the material master in ECC 6.0. In that view, there is one customized field whose value needs to be transferred to EWM system using CIF (Core Interface). From the functional point of view, do we have to make any configuration for the interface for that customized field? Please suggest the configuration steps so that the customized field value should be transfered to EWM.
Thanks
SBS
Hi Experts,
Need your help in the following situation.
During stock removal I want WTs to be assigned to WOs as per two different rules.
Say in our system we have:
1 pallet = 10 EA
Available stock:
Bin i: 5 EA
Bin ii: 10 EA
Bin iii: 10 EA
Stock to be removed: 18 EA
Ive maintained two WOCR in the following sequence:
WOCR 1: Filter: Only full pallet withdrawal
WOCR 2: Filter: No restrictions
While execution 3 WTs are being created:
WT 1: 5 EA from Bin i
WT 2: 10 EA from Bin ii
WT 3: 3 EA from Bin iii
So im expecting these WTs to pass through the filters and get me 2 WOs:
WO 1: WT 1, WT 3
WO 2: WT 2
But WOCR 1 is not getting triggered at all and all 3 WTs are getting assigned to one WO via WOCR 2.
Please Suggest.
Regards,
Oritra
Hello Experts,
We are transferring material from storage location to storage location by movement type 311.
Both the storage locations are assigned to the same warehouse.
Can any body guide me through the process as well as the configuration settings.
Regards,
Amit
Dear Experts,
SAP help says:
"Providing you are using SAP Extended Warehouse Management (SAP EWM), you can trigger kit to stock through corresponding planning in ERP (or APO). In this case, production orders in ERP are used as a basis for creating inbound and outbound deliveries. These deliveries are then sent to EWM, where a value-added service order is created."
We are considering this scenario, but our ERP system works with process orders only.
Can this functionality be achieved for process orders as well without development?
Thank you.
Petr
Dear Experts,
I try to perform following test:
I create an inbound delivery in ERP system with MB1C:
After this I perform the packaging by using VL32N:
At the end I distribute this delivery to my EWM System by using of VL06I:
So when I switch to EWM system, I can find my inbound delivery:
As the next step I try to change the default Warehouse Process Type but for some reason even it an editor modus it is not possible:
Why is this change not possible? Do may be someone has any hits?
Thanks in advance
BR
Denis
Hi All,
What is the standard suggested way to do counting and QI in the Outbound process in EWM? I did not find any IOT for Outbound inspection and neither is there an external count/QI step in POSC for outbound.
Any pointers on this will be a great help.
Thanks
James
Hi Experts,
Requirement is to add field in product master. But not able to see the component SCM_MD in EEWB. Need your help to import the missing business object.
Thanks
Is there a way to deactivate auto printing of TO for some storage bins ? If yes then can you please tell me step by step configuration?
If no then how can we deactivate auto TO printing for the Storage type ?
Hi Team,
Can any one explain the process of Production order process and staging with respect to EWM?
Thanks in advance.
Regards,
Syed
Hi Experts,
When Production order is released or updated for MTS or MTO, we are carrying out picking activity.
This activity creates required HU but it does not determine the drop point on RF gun as well as does not create drop point task automatically.
If anyone has come across similar issue or handled this earlier, then your information shall be of great help.
Regards
Siddhant